Walk-In Showers

Walk-In Showers and Tub to Shower Conversion in Hampton Roads

The tub comes out, the plumbing and drain are adapted, a shower base and waterproofed walls go in, and glass, a niche and grab bars finish it.

5.0

By the numbers

A tub alcove is shower-sized

Most conversions fit the space the tub leaves. These are the measurements that shape the plan.

  • 60in

    Standard tub alcove

    Most tubs sit in a space five feet long. A shower fits the same footprint.

  • 30in

    Smallest width

    The building code asks for at least 30 inches of clear width inside a shower.

  • 900sq in

    Smallest floor

    The least floor area the code allows for a shower.

  • 33–36in

    Grab bar height

    Where a horizontal grab bar sits above the floor, on blocking in the wall.

From the residential building code and accessibility guidance. Your bathroom is measured before anything is ordered.

Before and after

Same alcove, no tub to climb over

The shower goes where the tub was. The rest of the bathroom can stay as it is.

Stays
Vanity, toilet, floor and the walls outside the alcove.
Changes
The tub becomes a shower base, with waterproofed tile walls, glass, a niche and a grab bar.
Illustration, before: a bathroom with an alcove tub and curtain; after, the same bathroom with a tiled walk-in shower, glass panel and grab bar
Illustration. Drag the handle to compare.

Options

Three ways into the shower

The entry is the main choice. It decides how the floor is built and who can use the shower easily.

With a curb

The classic shower.

The entry
A step of a few inches.
The floor
A sloped pan inside the curb.
Keeping water in
The curb and a door or curtain.
Best when
You step over a curb easily and want the simplest build.

Low threshold

Easier to step into.

The entry
A low step, easy to cross.
The floor
A shallow pan.
Keeping water in
A glass panel or a door.
Best when
You want an easier entry without changing the floor structure.

Curbless

No step at all.

The entry
The bathroom floor runs straight into the shower.
The floor
Lowered or sloped to the drain, which can mean work on the framing.
Keeping water in
The slope and a linear drain; glass is optional.
Best when
The shower has to work with a walker or a wheelchair, now or later.

How it is built

What keeps a shower dry behind the tile

Tile and grout are not waterproof by themselves. The layers behind them are what protect your walls and floor.

Illustration of a shower wall taken apart: wood studs, backer board, blue waterproof membrane, mortar and white tile Framing and blocking Studs, plus solid blocking where grab bars, a bench or a niche will go. Backer board A cement or foam board made for wet areas. Unprotected drywall does not belong in a shower. Waterproof membrane A sheet or liquid coating that seals the walls and the pan and ties into the drain. Thinset mortar Bonds the tile to the wall, with full coverage behind each piece. Tile and grout The surface you see and clean.

Materials

Showers and tile to choose from

What each one is, what it suits and what to know before you choose is in our bathroom remodeling guide.

See the bathroom guide

From the job site

On site for a shower rough-in

The fittings, the PEX and the valve caps checked with the plumber before the tile goes on.

Look, I brought you all the fittings.

Cristian Cuevas, owner of Cuevas Construction

In Spanish, with English subtitles.

Read the transcript in English

Look, I brought you all the fittings. "The cross fitting?" "Yes." Look, this is the cap for the kitchen line. He'll put the valve here later, and this cap goes up where the faucet will be. That one's for the shower faucet, so nothing drains down, right?

What you do is bring the PEX down. This one goes in here. The PEX runs from the faucet down: a short piece like this, you push it in here, put the clamp on, crimp it, and it's sealed off.

[The crew works on the shower walls] That base, too: in case the bottom isn't painted or needs a little joint compound, you can do it as well. "When do you think we start the tile?" "Are they starting today?"

"Yes, they're on it." "Let's do it that way." "I've got these guys filming behind me." "We'll get it going, my friend." "Sure, anything, give me a call." "A pleasure." That one has to go up, at least. How are you, ma'am? All good? Great.

Yes, this one has to go up. It won't fit there. And that's the height it was at, but no. About here. Go ahead.

Cristian Cuevas, owner · In Spanish, with English subtitles

Cost

What affects the cost of a conversion

We do not publish prices: every bathroom is measured first. These are the things that move the number.

  1. Plumbing

    Moving the drain or the valve costs more than leaving them where they are.

  2. The base

    A tiled pan costs more than a ready-made one, and curbless more than either.

  3. Walls

    Tile size, pattern and niches set the labor.

  4. Glass

    A fixed panel costs less than a full enclosure.

How it works

How the conversion works

One bathroom, one crew, in this order.

  1. Tub out

    The tub and the old surround come out, down to the studs.

  2. Plumbing

    The drain moves to where the new base needs it, and the valve is set at shower height.

  3. Framing and blocking

    Solid blocking goes in where grab bars, a bench or a niche will be.

  4. Base and waterproofing

    The pan goes in and the walls are sealed. This is the part that keeps the shower dry.

  5. Tile

    Walls and base are tiled and grouted.

  6. Glass and fixtures

    Glass, shower head, controls and grab bars finish it.

FAQ

Questions about converting a tub

Can you convert a bathtub into a walk-in shower?

Yes. The tub comes out, the plumbing and drain are adapted, a shower base and waterproofed walls go in, and glass, niche and grab bars finish it.

Can the shower go exactly where the tub was?

Yes. Most conversions use the same alcove. The drain moves from the end of the tub to where the new base needs it.

Should I keep one bathtub in the house?

It depends on the house and on who might buy it later. Many buyers look for at least one tub. If this is your only one, weigh that before you decide.

Tiled base or a ready-made one?

A ready-made base costs less and goes in faster. A tiled base can be any size and matches the walls. Both work when the waterproofing is done right.

Does a conversion need a permit?

Moving or replacing drain and supply lines usually needs a plumbing permit. We tell you at the estimate.

Free in-home estimate

Ready to trade the tub for a shower?

We will measure the bathroom, look at the plumbing and give you a detailed estimate at no cost.