Planning guideUpdated 2 min read

Our remodeling process and kitchen remodel timeline

The short answer

Every job goes the same way: a free in-home estimate, design and a detailed written estimate, permits where the city requires them, the build, and a final walkthrough. Published figures put a typical kitchen at four to twelve weeks of work once it is planned, depending on its scope (Angi, 2026); planning and ordering often take longer than the building itself.

Cuevas crew installing a window frame inside a home under renovation
From our jobs

1. Free in-home estimate

We come to your home, measure the room and look at what we can see of the plumbing, wiring and framing. We ask how you use the space and what bothers you about it today. Bring any photos or ideas you have saved.

There is no charge for the visit and no obligation.

Illustration of a remodeling plan: a calendar, a kitchen floor plan, a model kitchen being installed and a checklist
IllustrationPlanning comes first: layout, selections, permits and dates, before the first wall opens.

2. Design and a detailed estimate

You see the layout and the choices of materials, and get a written estimate that lists the scope of the work. Nothing starts until you have agreed to it in a written contract.

This is also when the main selections are made: cabinets, countertops, tile, fixtures, flooring. Items with long lead times are ordered early so the work does not stop to wait for them.

3. Permits

Work that changes plumbing, wiring or walls usually needs permits from the city. We tell you which ones your project needs and handle them as part of the job. See permits in Virginia Beach and Norfolk.

4. The build

The work follows a fixed order, because each step depends on the one before it:

  1. Protection and demolition. Floors and the rest of the house are covered; the old room comes out.
  2. Repairs and rough-in. What the walls reveal is fixed; plumbing, wiring and ventilation are moved or added; inspections happen here when the city requires them.
  3. Walls and floors. Drywall is closed and finished; the floor goes down.
  4. Cabinets, counters and tile. Cabinets are set, countertops are measured from them and installed, tile and backsplash follow.
  5. Fixtures and finish. Sinks, faucets, lighting, appliances, trim and paint.

One person on our team keeps you up to date and answers your questions while the work goes on.

5. Final walkthrough

We walk the finished room with you, test everything and take care of anything on the list. Where a permit was pulled, the final inspection closes it.

How long a remodel takes

The length of a remodel depends on its scope more than its size: a kitchen that keeps its layout moves faster than one where walls, plumbing and wiring move. Waiting for custom cabinets, countertops or special-order items often takes longer than installing them.

Kitchen remodelPublished time
Minor (Angi)One to two weeks
Midrange (Angi)Four to eight weeks
Extensive (Angi)Eight to twelve weeks or more
Planning before work (Angi)Two weeks to four months; permit approval up to four weeks
Homeowners' kitchen projects (Houzz, 2025 projects)9.5 months of planning and 5.8 months of construction, on average

Angi describes typical projects once they are planned.1 Houzz averages are what homeowners reported for their own projects, from the first idea to the end.2 For bathrooms, see how long a bathroom remodel takes. We give you the schedule for your project with the estimate.

Sources

  1. How Long Does a Kitchen Remodel Take?, Angi, updated July 8, 2026.
  2. 2026 U.S. Houzz & Home Study: Renovation Trends (2025 projects), Houzz Research, April 22, 2026.

Figures are the published averages and medians of these sources, not Cuevas Construction prices. Your project's cost comes from an in-home estimate.

How it works

The five steps, at a glance

You know what comes next at every step.

  1. Free in-home estimate

    We measure, look and listen.

  2. Design and written estimate

    Layout, selections and a scope you agree to in writing.

  3. Permits

    Pulled where the city requires them.

  4. Build

    Demolition, rough-in, walls and floors, cabinets and tile, finishes.

  5. Walkthrough

    Everything tested; anything on the list taken care of.

The build, in order

The order a kitchen goes together

A kitchen is built in layers. Each one depends on the one before it, which is why the sequence matters.

Illustration of a kitchen taken apart: open wall with pipes and wiring, drywall, cabinets, countertop and backsplash with faucet Plumbing and electrical With the walls open, lines are moved and circuits added. Inspections happen here when the city requires them. Walls Drywall is closed, finished and primed. Cabinets Set level and fastened to the walls. Everything after this is measured from them. Countertops Measured with a template once the cabinets are in, then cut and installed. Backsplash, fixtures and appliances Tile, sink, faucet, lighting and appliances finish the room.

FAQ

Process questions

Do I need to be home while the work is done?

No. We agree on how we get in and how you hear about progress. Many homeowners stay in the house during the work.

Who pulls the permits?

We do, as part of the job, when the work needs them.

What happens if you find damage behind a wall?

We stop, show you what we found, and give you a written change order before doing any work that was not in the estimate.

How do I get on the schedule?

Start with a free in-home estimate. The start date is set once the scope is agreed and the materials with long lead times are ordered.

Free in-home estimate

Ready to start with step one?

Book a free in-home estimate. We will measure, listen and give you a detailed estimate.