Bathroom guideUpdated 3 min read

Bathroom remodel checklist: plan it right

The short answer

Decide what has to change and how you use the room, choose the shower or tub, vanity, tile and fixtures before work starts, plan for what may be behind the walls, and finish with a walkthrough. The list below goes in the order the decisions come up.

Vanity with granite counter, black mirror and four-light fixture
From our jobs

Before you start

  • Write down what bothers you about the room today. Not enough storage, a tub nobody uses, a slippery floor, poor light. That list is the scope.
  • Decide who uses the bathroom and how. A hall bath for kids, a primary bath for two, a guest bath, a room someone will need to use with a walker later.
  • Measure the room and the doorway. Note where the toilet, drain, window and door are. Moving any of them changes the job more than anything you pick from a catalog.
  • Set a budget range and a number you will not pass. Keep part of it aside for surprises behind the walls.
  • Plan where you will shower while the work goes on. If it is your only bathroom, ask how the work can be phased.
Illustration of an older bathroom with a tub and shower curtain
IllustrationStart with what the room has now: where the drain, the toilet and the window are decides most of the plan.

Choices to make before work starts

  • Shower, tub or both. A walk-in shower, a tub with a shower, or a separate tub. See walk-in shower or tub.
  • The shower floor and entry. A low curb, or a curbless entry for easier access.
  • Vanity. Width, single or double sink, drawers or doors, and the countertop.
  • Tile. Floor tile, wall tile, a niche for bottles, and the grout color.
  • Fixtures and finish. Faucets, shower valve, toilet, and one metal finish for all of them.
  • Lighting and fan. Light over the mirror, a ceiling light, and an exhaust fan sized for the room.
  • Glass or curtain. A glass door or panel needs to be measured after the tile is set.
  • Grab bars, now or later. Solid backing in the walls costs little while they are open and makes bars easy to add any time.

Order long-lead items such as a vanity or a glass door early, so the work does not wait for them.

What to check behind the walls

Most surprises in a bathroom remodel are water. In older Hampton Roads homes they tend to show up around the tub, the toilet and under the floor once the old surfaces come off.

  • Subfloor. Soft or stained wood around the toilet and the tub is replaced before any new floor goes down.
  • Framing. Studs and joists are checked for rot and for notches cut by earlier plumbers.
  • Plumbing. Old supply lines and drains are easiest to replace while the wall is open.
  • Wiring. Outlets near water are protected against shock, and new lights and the fan get their own circuit where needed.
  • Waterproofing. A shower gets a continuous waterproof layer behind the tile, not just tile and grout.
  • Permits. New fixtures, drains, wiring and changed walls usually need permits. See permits in Virginia Beach and Norfolk.

While the work goes on

  • Agree on how you will hear about progress and who to call with a question.
  • Look at the waterproofing before tile goes over it, if you want to see it. Ask for a photo if you cannot be there.
  • Confirm tile layout and fixture heights on the wall before they are set: niche height, shower head, valve, towel bars.
  • Keep changes in writing. Any change to the scope gets a written change order before the work is done.

At the end

  • Walk the room with the contractor. Run every faucet, flush the toilet, run the shower and the fan, check that water flows to the drain.
  • Check the details: caulk lines, grout, the glass door closing, drawers and doors opening fully.
  • Get the paperwork: final inspection sign-off where a permit was pulled, product manuals and care instructions for the tile, grout and fixtures.
  • Keep a few spare tiles from the same box, for any repair later.

Before and after

From the checklist to the finished room

An illustration of a common change: the tub comes out and a walk-in shower goes in where it was, so the drain stays close to where it is.

Stays
The room, the window and most of the plumbing
Changes
Tub out, shower in, new tile and glass
Check
Subfloor, waterproofing and the drain slope
Illustration, before: a bathroom with a tub and curtain; after, the same bathroom with a walk-in shower and glass panel
Illustration. Drag the handle to compare.

How it works

The order the decisions come up

Keep this order and nothing waits for a choice that was not made.

  1. Scope

    What has to change, and who uses the room.

  2. Layout

    Where the shower, vanity and toilet go. Moving plumbing is decided here.

  3. Selections

    Tile, vanity, fixtures, lighting and glass, ordered early.

  4. Behind the walls

    Repairs to the floor, framing, plumbing and wiring once they are open.

  5. Finishes

    Waterproofing, tile, fixtures and glass.

  6. Walkthrough

    Everything tested, the list closed, the paperwork in hand.

FAQ

Bathroom planning questions

What should I decide first in a bathroom remodel?

Whether the layout stays. Keeping the toilet, the drain and the shower valve where they are keeps the job simpler; moving them changes everything after it.

Can I stay in the house during a bathroom remodel?

Usually, yes. If it is your only bathroom, ask how the work can be phased so you have a working toilet as much as possible.

Do I need to pick everything before the work starts?

Ideally, yes. Tile, vanity, fixtures and glass decide measurements and lead times, so choosing them early keeps the work from waiting.

Should I add grab bars even if I do not need them yet?

Adding solid backing inside the walls while they are open costs little and lets you put bars in any time later without opening the wall again.

Free in-home estimate

Ready to plan your bathroom?

Bring this list to a free in-home estimate. We will measure, look at what we can and give you a detailed estimate.